In early June, our company held a successful work of setting the hydraulic whipstock KLEN 9-5/8" anchor type fo an open hole in the well at Kuleshovsky oil field in Samara region for "Samaraneftegaz.
It was decided to solve several problems while setting the Whipstock for open hole to isolate the absorption zone below it. To deliver the original anchor-packer to the required depth and set it was a hardest part as well behaved unpredictably, then swallowed, then showed. In cooperation with "Perekryvatel" we developed a design and technological solution for a short time, just a few hours were spent, It was made the original anchor-packer type whipstock KLEN AP 9-5/8. Once again, our long-time collaboration with a partner "Perekryvatel" LLC has yielded good results, and most importantly, helped to effectively solve the problem faced by our Client JSC "Samaraneftegaz" during drilling in the complicated conditions at a depth of 3000 meters. As a result of proper installation in openhole of the original anchor-packer whipstock could help to solve the problem as Absorption zone and allowed to continue drilling. Currently it continuing the further drilling.